Projects

Projects completed, and projects under way.

A few recent examples, from single buildings to borough-wide contracts — new build, permitted development, occupied residential blocks, listed conversions and commercial premises. Fire, electrical and security, installed, tested and certified by our own engineers. There is more than fits on one page, so tell us what your site is and we will send the closest matches to it.

Selected projects

The 117-flat permitted development conversion under scaffold Electrical · Fire · Security
North East England

117-flat permitted development

A full permitted development conversion, delivered as one package instead of three trades.

117 flatsCommunal areasFull electricalFire & security
£1mil+Contract value
15 monthsProgramme
The problem

A conversion of this size normally means an electrical contractor, a fire contractor and a security contractor, three programmes and three sets of paperwork that never quite line up at handover.

What we did

Complete electrical installation across all 117 flats and the communal areas — first and second fix, consumer units, submains and metering — plus the fire alarm, disabled refuge and AOV integration, all by our own engineers.

Outcome

One contractor, one programme, one handover pack. Every certificate issued by the company that did the work.

Piccadilly House, Piccadilly, London Fire & Security
Piccadilly, London

Piccadilly House

Comprehensive site-wide fire and security installation on a landmark central London site.

Fire detectionEVCSWC alarmsCCTV
£190k+Contract value
12 monthsProgramme
The problem

Two connected buildings in one of the busiest parts of central London, occupied throughout, needing seven separate systems brought up to current standards without closing anything.

What we did

Design, installation and commissioning of fire detection, emergency voice communication, WC alarms, CCTV surveillance, video entry access control and intruder alarm systems.

Outcome

Full compliance achieved across both buildings, with every system interfaced rather than simply installed alongside one another.

Challen Court, one of the twelve retirement buildings in the Sussex programme Fire
East & West Sussex

E & W Sussex legacy works

Full replacement of fire alarm systems across twelve occupied retirement buildings.

12 buildings350+ flatsWarden call integrationPhased handover
£350k+Contract value
4 monthsProgramme
The problem

Twelve retirement buildings, all occupied by vulnerable residents, all needing their fire alarm replaced — and none of them able to lose detection overnight.

What we did

New smoke and heat detectors in over 350 flats, each fully integrated with the existing warden call system on its site, phased building by building.

Outcome

Completed inside the four-month target with no resident left without cover at any point.

The courtyard at the Tunbridge Wells permitted development Electrical
Kent

Tunbridge Wells

Full electrical installation across 85 residential flats and the communal areas.

85 flatsCommunal areasFirst & second fixConsumer units
£650k+Contract value
9 monthsProgramme
The problem

A permitted development conversion on a tight programme, where the electrical package had to keep pace with the build rather than follow it.

What we did

First and second fix throughout, consumer units to every flat, testing and certification as each floor completed rather than all at the end.

Outcome

Certificates issued progressively, so handover was not held up waiting for paperwork.

The Boris Factory, Islington — the converted factory building and courtyard Electrical
Islington, London

The Boris Factory

Complete electrical development for a listed building conversion.

Listed building3 office blocks6 housesHistoric Victorian site
£390k+Contract value
OngoingProgramme
The problem

A listed Victorian site where containment routes, fixings and visible services all have to satisfy conservation as well as BS 7671.

What we did

Full electrical installation across three large office blocks and six residential houses within the historic site, with routes agreed before anything was cut or fixed.

Outcome

A modern, certified installation inside a listed envelope — ongoing as the site develops.

Map of the 33 London boroughs with the River Thames, showing the area this framework covers Electrical
London · ongoing contract

London borough council void programme

Borough-wide void property upgrades, EICR testing and remedial works.

Borough-wideEICR testingVoid upgradesRemedial works
FrameworkContract value
OngoingProgramme
The problem

Void properties have to be inspected, made safe and re-let quickly. Slow paperwork costs the council rent every week a property sits empty.

What we did

A large-scale ongoing framework: void property upgrades, EICR testing, inspections and remedial works across the full borough, to the council’s turnaround times.

Outcome

Housing stock kept safe and compliant, with certificates loaded to the council’s systems as work completes.

One of the two residential blocks at Raynes Park Fire & Security
London

Raynes Park

Two residential blocks, one integrated fire and security system.

Fire alarmAccess controlCCTVVideo entry
£160k+Contract value
9 monthsProgramme
The problem

Two blocks with separate entrances but a shared management arrangement, and an existing AOV smoke control system that had to be tied into the new fire cause and effect.

What we did

Full design, installation and commissioning of fire alarm, access control, CCTV and video entry across both blocks, integrated with the existing AOV system.

Outcome

Smoke clearance proven on alarm, and one system for the managing agent to deal with rather than four.

The warehouse at Leighton Buzzard covered by the beam detection system Fire
Bedfordshire

Leighton Buzzard

Beam detection for a large commercial warehouse.

Beam detectionOpen-span coverageCommercialBS 5839
£60k+Contract value
3 monthsProgramme
The problem

A warehouse with spans far too large for point detection — the wrong system here means either no coverage or constant false alarms.

What we did

Design, installation and commissioning of a new beam detection fire alarm system, surveyed and aligned for enhanced smoke detection across the open-span areas.

Outcome

Delivered efficiently within three months, with coverage that actually suits the building.

Want references you can ring?

Housing associations, a London borough framework and a listed building conversion. Client references supplied at tender stage.